The hull of ex-Long Beach was still in Navy hands until just last month when it was sold for scrap. There's a multi-year delay between the removal of the reactor compartments and when the hull is sold, probably to allow for any areas of residual radiation to "cool off".
I was under the impression (from the sales documentation) that the Navy was scrapping the Long Beach in one of the PSNS drydocks and loading the scrap onto a barge.
7,350,000 lbs approximately. Structural steel (CGN 9 cruiser, (USS long beach). This is a three year term contract at Puget Naval Shipyard.The price per pound will be adjusted every month beginning with the first full month after the start of the contract.
The price will be adjusted during the second week of the month. The revised price will be determined by taking the price of Seattle AMM No. 2 Bundle on the first Thursday of the month and dividing it into the of Seattle AMM No. 2 Bundle used on the contract start date. The percentage will be applied to the price per pound to arrive at an adjusted price.
The contract will consist of heavy, and light steel, ship hull structural sections with attachments. Ship hull structure is generated from surface ship dismantlement and includes hull plating, structural bulkheads, decks, foundations, ladders, watertight doors and hatches, joiner doors, ventilation ducting, fans, cooling coils, heaters, liquid heat exchangers, radiators, galley equipment, ferrous and non-ferrous piping with plumbing fixtures and attachments, light fixtures, valves, furnishings including tables, chairs, marine machinery and other equipment with bunks, lockers and attachments. Attachments may include non-ferrous alloys such as aluminum, stainless steel, copper and cupro-nickel, brass/bronze, and foreign materials including grease, and oil residue, fiberglass insulation, hull insulation, plastic, and rubber products, glass, deck tile with underlying terrazzo and non-friable asbestos products in the form of flange gaskets, valve packing, and duct seals. Machinery may consist of reduction gears and casings, propulsion shafts, and propellers, turbine casings, pumps, condensers, compressors, refrigeration, and distilling units, auxiliary boiler, emergency diesel generators, turbine generators, anchor handling equipment, steering gear equipment, and other machinery. No electrical wire-way runs, switching components or transformers, nor freon is included.
All material considered as scrap due to methods of dismantlement and demilitarization that may be required. Installed flange gaskets and valve packing may contain non-friable asbestos. Mechanical joints with suspect material shall be leak tight sealed and labeled with asbestos warning labels. Duct seal may contain asbestos fibers. Suspect materials are required to be transported, handled, and disposed of in accordance with applicable local, state, and federal regulations.
The contractor will provide, at their expense, one 200' x 50 -60' or equivalent commercial barge for loading of large ships hull sections. Maximum weight per section is 100,000 pounds. With the average weight of loaded barge pieces being approximately 62,500 pounds, watertight integrity is of elevated importance, and shall be maintained on all delivered barges. All delivered barges will have no less than four mooring lines. Mooring lines are to be of suitable size and strength for mooring fully loaded barges. Barge loading decks will be clean and free of all forms of construction debris such as timbers, sand, and rocks. Initial barge availability will be provided upon 7 days written or verbal notification and shall be on a continual rotating basis. Continual rotating basisÂis defined as maintaining an empty barge at PSNS during peak loading periods, as notified by the shipyard. Approximate peak loading period should begin fourteen months (November 2013) into this ship breaking undertaking. Barges may be held at PSNS for loading for periods not to exceed 5 days on average. Weather conditions and equipment operations may affect ability to load and dispatch barges at any given time. Contractor will be notified of these delays and afforded the opportunity to remove partially loaded commercial barges.
Due to the size and shapes of ships hull material, safety, and load stability concerns, there are no minimum barge load weights specified or implied. Individual piece weights will be recorded, and tallied for total barge weights, this total weight will be final weight for billing purposes. Loaded barges shall be rotated out with empty barges within 24 working hours of written or verbal notification. Smaller recycled material pieces or equipment may be loaded onto flatbed tractor-trailers, Or loaded into open top 30 - 40 cubic yard capacity roll-off containers that use a cable bale system only. The contractor shall maintain a minimum quantity of two containers at the shipyard for accumulation of scrap recycling products. Initial two containers will be required during the month of August 2012. The contractor will label their containers with the company name, the container tare weight and an identifying number. Labeling will be of a permanent nature. PSNS reserves the right to verify all tare weights of containers when delivered to the shipyard. PSNS reserves the right to refuse any roll-off containers determined to be in an unsafe or poor condition. The contractor will be required to replace any roll-off container in an unsafe or poor condition within 48 hours of notification of the subject container. The contractor is required to remove full roll-off containers and replace them with empty containers within two workdays of verbal notification and within four workdays of written notification by Government Liquidation or its PSNS representative when removal is required. You are responsible for rigging, loading, securing and transporting purchased property, including all costs and risks associated with removal. Unless otherwise stated, we will provide a free tailgate loading but will NOT guaranty a specific loading time. In consideration for this 'no cost' loading service, you agree to release, hold us harmless and waive any and all claims, causes of actions, damages (including consequential damages or loss of use) or liabilities of any kind or nature. Transportation conveyances are required to have tarpaulin capabilities.
All personnel entering the Puget Sound naval shipyard for viewing or pick-up are required to be United States citizens. A true copy of persons birth certificate with raised seal or valid passport along with a form I-9 will need to be presented at the pass and Id office. An entrance letter to Puget Sound Naval shipyard must be obtained from John Miller at 253-966-1430 and returned at least 3 days prior to viewing or initial pick-up time. Pictures are representative of actual product. Superstructure of cruiser has been removed.