I was having a discussion regarding the improving of supply situation of the german afrika corps , one of the solutions proposed by German engineers was building a railroad from TRIPOLI to BENGHAZI in twelve months and another three months for the extension to Derna .
I have found the suggested timetable overoptimistic (about two miles of railroad build by day ) but the counterargument was that NZ engineers managed even 4 miles per day (on smaller sections) in the opposite direction.
CHAPTER 9 — The Western Desert Railway | NZETC
What do you think.?
I have found the suggested timetable overoptimistic (about two miles of railroad build by day ) but the counterargument was that NZ engineers managed even 4 miles per day (on smaller sections) in the opposite direction.
CHAPTER 9 — The Western Desert Railway | NZETC
What do you think.?