View Single Post
Old 02-06-2007, 03:54 AM   #6 (permalink)
stuuu28
New Member
 
Join Date: 12-11-06
Posts: 3
Country:
But what about keeping design capability in the UK. With Type 45 prodution well under way and CVF design about to be finalised???? i would imagine that the teams in Portsmouth and Scotsoun ( is that where the design centres are?) will need some work soon?
I would say a BIG no to any more joint european projects, and limit it to bying off the shelf systems PAAMS etc.
stuuu28 is offline   Reply With Quote